With  an  electrohydraulic  control  system,  electrical  power,  fed  through  a

               multicore conductor, actuates solenoid-operated valves  in the control pod. Then,

               only  a  single  hydraulic  hose  is  required  to  deliver  the  hydraulic  fluid  to  the

               accumulators. Some systems have incorporated the accumulator fluid supply line

               into the integral riser system.

                      Pure  electric  control  or  multiplex  systems  are  also  being  manufactured

               where  electric  signals  and  electrical  power  are  sent  to  the  BOP  stack  through  a

               single,  multicore  conductor  connected  to  each  control  pod.  Acoustic  control

               systems  generally are  not being considered as a prime operating system but are

               being employed as a backup control system for subsea BOPs.

                      If and when a higher-then-expected well bore pressure is encountered while

               drilling, the annular and ram preventers can be closed to seal around the drill pipe.


               The pressure buildup is controlled by circulating heavier drilling mud through the
               drill pipe and back through the choke or kill lines. Once the mud column pressure


               exceeds  the  formation  pressure,  the  preventers  can  be  opened  and  drilling  may
               continue.


                      In the event sea conditions make it imperative to disconnect from the BOP
               stack, an emergency drill pipe hangoff tool can be landed in the subsea wellhead


               housing. The well can then be sealed by closing the bottom pipe ram around the

               drillstem  of  the  emergency  drill  pipe  hangoff  tool.  The  running  tool  is  released

               from the hangoff tool, and the remaining drill pipe may be retrieved. At this point,

               the blind ram is closed above the hangoff tool and the hydraulic connector in the

               lower riser package is disconnected. The drilling vessel is then in a position to ride

               out the emergency, leaving the well in a secure and shutin condition. During the

               reconnection and reentry procedure, it is important to circulate through the choke-

               and-kill lines so any pressure built up under the closed rams is bled off before the

               drill pipe is lowered and reconnected.

                      Only under extreme emergency conditions are the blind shear rams closed

               on a drillstring. In such case, one of the pipe rams below the shear rams preferably