Page 151 - 4714
P. 151

a)     pit             d)     contractor       g)    migratory
                           b)     bulldozer       e)     wastes           h)    hole
                           c)     fence           f)     sensitive        i)    plastic
                                  Modern reserve pits mainly hold rig _____ (1) temporarily. For
                           example, cuttings carried up the _____ (2) by the drilling mud fall into
                           the reserve _____(3). After finishing the well, the drilling _____ (4) or
                           operator  removes  any  harmful  material  that  may  be  in  the  pit  and
                           properly disposes of it. A _____ (5) then covers it with dirt and levels
                           it.  If  necessary,  the  contractor  lines  а  reserve  pit  with  _____  (6) to
                           prevent soil and groundwater pollution (fig. 61). In especially _____
                           (7) areas, such as in a _____ (8) bird flyway or in a wildlife refuge,
                           contractors cover the pit with netting to prevent birds from landing in
                           it. In addition, they may put up a _____ (9) to keep cattle or wildlife
                           out.

                           9  Scan the text and correct spelling and grammar mistakes.

                                  On a drilling locations where the ground are soft, a rathole rig
                           and crew cannot be needed. Instead, the contractor can usualy move in
                           the  regular  rig  and  his  crews  right  away.  Once  the  driling  crew
                           members got the regular rig ready, they rig up a pile diver and drive
                           the conductors casing onto the ground, just as Colonel Drake did in
                           Oil Creek. Though, peoples in the oil patch sometime call conductor
                           casing  “drive  pipe.”  After  driving  a  casing,  the  rig  crew  begans
                           drilling inside it.
                           If the ground is too difficult for the conductor pipe to be drive, crew
                           members  can use the regular rig to drill the  conductor hole.  What's
                           more, they may also drill the rat hole and mouthhole, using specific
                           equipment on the regular rig.
























                                                                                           150
   146   147   148   149   150   151   152   153   154   155   156