*  - In place (wave, current, wind, tide, settlement, earthquake, ice, accidents,

                      redundancy, etc.)

                   *  -  Construction  (fabrication,  load-out.  transportation,  installation  including,

                      up  righting,  lifting,  pile  and  conductor  driving,  temporary  installation

                      conditions, strength and stability)

                   *  - Fatigue, corrosion

                   *  - Accidental

                   *  -  Other  relevant  design  cases  (deck  vibrations,  drilling  rig  configurations,

                      etc.).

                   2.  Design drawings include:

                   *  - Deck plans and elevations

                   *  - Main and secondary trusses


                   *  - Connections (joints) and stiffeners
                   *  - Welding details


                   *  - Pile and conductor details
                   *  - Pad-eyes and other lifting connections


                   *  - Tie-down bracing
                   *  - Launch trusses and braces


                   *  - Appurtenances

                   *  - Any other details required for platform fabrication

                   3 Specifications cover:

                   *  - Design and construction

                   *  - Equipment and materials

                   *  - Painting and corrosion protection

                   *  - Hookup and commissioning

                   *  - Others as needed

                   4. Procedures define certain critical operations in steps to ensure that these are

               carried out in accordance with the design requirements. These may include:

                   *  - Welding