*  As the size of a jacket structure  increases, it is built and transported on a

                      cargo barge in the horizontal position. The jacket is lifted off the cargo barge

                      using one or two cranes. Following pick-up, the cargo barge is withdrawn

                      and  the jacket  is  upended. Single cranes  with two  blocks can be  used  for

                      upending smaller jackets with the jacket length aligned with the plane of the

                      crane boom. There are several methods of upending jackets:

                   *  Two-block upending - upending in air or partially in water using two crane

                      blocks. In this method, the jacket does not have sufficient buoyancy to float

                      without crane assistance. Instead, the upending is achieved by hoisting down

                      the block of one of the two cranes while the other is hoisted up. Figure 4.2

                      shows  a  two-block  upend  operation.  The  size  of  the  jackets  that  can  be

                      upended with a single crane is limited.









































                                             Figure 4.2 – Two block upending

                   Single-block  upending.  A  jacket  installed  using  this  method  needs  to  have

               sufficient buoyancy to float in the horizontal position by itself. In this method, the