  Non-generated  loads  (equipment  and  supplies-  wet/dry  -,  empty  area

                          loads,  live  loads,  dynamic  vibrations  from  rotating  machinery,  mud

                          pumps and operations, etc.),

                        Design life (operating and fatigue),


                        Accidental design loads (boat impact, dropped objects, fire and blast),

                        Load  combination  cases  (extreme  environmental,  operational,

                          serviceability, transportation, lift and launch),

                        Damaged  stability  and  or  redundancy  requirements  (missing  member,

                          flooded leg or compartment),

                        Preferred material classes,

                        Design regulations, codes and recommended practices,


                        Appurtenances  and  their  locations  (escape  and  evacuation  equipment,
                          escape  ways,  stairs.  boat  landings,  barge  bumpers,  conductors  and  J-


                          tubes, mud-mats, etc.),

                        Corrosion  protection  requirements  (type-anode,  impressed  current-  and

                          life),

                        A  narrative  of  construction  methods  and  procedures  that  will  have  an

                          impact  on  the  platform  configuration  and  sizes  (skidding  and  load-out

                          procedures, pulling points, lifting eyes, launch skids etc.),

                        Verification and certification requirements,

                        Any other owner requirements that will impact detailed design (jack-up

                          drilling unit clearances, tender rig sizes and weights.

                   Detailed  design  (also  called  by  some  as  the  “execute  engineering  phase”  or

               “final design phase”) includes all engineering analyses; approved for construction

               (AFC) detailed design drawings, specifications, procedures and reports required to

               allow  fabrication,  transportation,  installation,  pre-commissioning,  HUC,  startup

               and operations of a platform.

                   1. Engineering analyses include all design conditions: