Page 43 - 6634
P. 43
spread, faults, domes, traps, permeability, etc. and an approximate estimate
for recoverable reserves of hydrocarbons.
* Depending on the water depth, environment and the availability, a suitable
exploration scheme is selected.
* The design spiral shown in fig. 4,1 illustrates the iterative process involved
in selecting and designing an offshore production system. Each loop of the
spiral indicates one design cycle.
Figure 4.1 – Design Spiral and Field Development Timeline
* The first loop around the spiral generally involves evaluating several field
development options, which satisfy the input requirements and establishing
their relative merits with respect to the decision criteria. In this loop, not
only alternatives for field development systems, but also alternatives for
each major system component are identified, developed and ranked.
* The next loop involves preparing a preliminary design for the selected
system. In this phase, the selection activity is focused on the system
components and detail elements.
43