base/receptacle. The sales line receptacle will receive the 123/4-in.
                            OD pipeline.
                                                         30" LEVELING PILE (4 PLACES)












                            SALES  RISER
                            BASE

                                                            WELLHEAD RECEPTACLE (TYP)


                                Figure 2.29 - 21-well unitized template. (Courtesy Vetco)

                                   The  wellhead  receptacles  allow  wells  to  be  drilled  using
                            standard  subsea  drilling  techniques.  During  template  fabrication,
                            the guideposts for the wellhead receptacles are held in position at
                            top  and  bottom  during  welding  to  ensure  verticality  and  critical
                            spacing. To install the wellhead receptacles, a fixture is run down
                            over the four guideposts of the slot where the receptacle is to be
                            placed. The center of the fixture has an outer profile that matches
                            the  inner  profile  of  the  receptacle.  A  tapered  section  below  the
                            receptacle centralizes it on its support beams. When the receptacle
                            is landed and centralized, it is welded to the large support beams of
                            the template.
                                   There  is  likely to be quite a time  lag between setting the
                            template  and  completing  the  TLP;  consequently,  a  number  of
                            preliminary operations are carried out by a floating drilling vessel
                            (fig. 2.30) including:
                                   1. Setting and leveling the unitized template
                                   2. Connecting the sales pipeline
                                   3.  Setting  the  anchor  template  and  piles  for  mooring  the
                            TLP
                                   4. Drilling a number of the subsea template wells