tensioning system for support. Upon completion, each well will be
                            tied back to the platform for control at deck level. Key components
                            are simple and inherently reliable but will have redundant backups
                            and are replaceable for inspection and maintenance.






























                                     Figure 2.28 - TLP production system. (Courtesy Vetco)





                             TEMPLATE
                                   The  21-well  unitized  template  design  shown  in  fig.  2.29
                            was  based  on  strength  requirements  and  use  of  an  easily
                            procurable  material. Possible  installation and  leveling techniques
                            are discussed fully in "Floating Drilling."
                                   This template contains 17 standard wellhead receptacles in
                            addition to four leveling pile  inserts that may  become well  slots
                            upon  completion  of  the  leveling  operations.  The  21  wells  share
                            guideposts,  as  they  are  spaced  8  Vz  ft  between  centers.  Also
                            included  at  one  end  of  the  template  structure  is  a  sales  riser

                                                           75