L, m Q, t The object Elements of object:
Variant economic Building Equipment networks
of
Energy
activity
covering – 10 tones, lines of the
reinforced thermal water supply
concrete slabs furnaces
One-storey Underground
masonry Thermal
boiler building, floor furnaces, gas cable lines,
16 180 2.5 ground
house covering – ovens, drying pipelines on
reinforced cabinets
concrete slabs overpasses
Lifting cranes
with a carrying
One-storey capacity: up to
masonry 5 tones, metal Underground
foundry building, floor working cable lines,
17 200 3 underground
shop covering – machines: lines of the
reinforced medium,
concrete slabs electric motors: water supply
medium and
small
Lifting cranes
One-storey with a carrying
building with capacity: up to Underground
armored 10 tones, metal
mechanical concrete frame working cable lines,
18 220 5 ground
shop and masonry. machines: pipelines on
50 % of walls heavy, electric overpasses
area are motors: small,
windows conveyor-
current line
One-storey Lifting cranes Underground
masonry with a carrying cable lines,
building, floor capacity: up to
19 350 6 tool shop ground
covering – 3 tones, electric pipelines on
reinforced motors: small,
concrete slabs electric trolley overpasses