L, m  Q, t  The object                           Elements of object:
                     Variant            economic           Building           Equipment            networks
                                             of
                                                                                                    Energy

                                          activity

                                                          covering –           10 tones,          lines of the
                                                          reinforced            thermal          water supply

                                                        concrete slabs         furnaces

                                                          One-storey                             Underground
                                                           masonry             Thermal
                                           boiler       building, floor      furnaces, gas        cable lines,
                  16     180     2.5                                                                 ground
                                           house          covering –         ovens, drying        pipelines on
                                                          reinforced            cabinets
                                                        concrete slabs                             overpasses

                                                                            Lifting cranes
                                                                            with a carrying
                                                          One-storey        capacity: up to
                                                           masonry           5 tones, metal      Underground
                                          foundry       building, floor         working           cable lines,
                  17     200      3                                                              underground
                                           shop           covering –           machines:          lines of the
                                                          reinforced           medium,
                                                        concrete slabs     electric motors:      water supply
                                                                             medium and
                                                                                 small


                                                                            Lifting cranes
                                                          One-storey        with a carrying
                                                        building with       capacity: up to      Underground
                                                           armored          10 tones, metal
                                        mechanical  concrete frame              working           cable lines,
                  18     220      5                                                                  ground
                                           shop         and masonry.           machines:          pipelines on
                                                        50 % of walls       heavy, electric        overpasses
                                                           area are         motors: small,
                                                           windows             conveyor-
                                                                              current line

                                                          One-storey        Lifting cranes       Underground
                                                           masonry          with a carrying       cable lines,
                                                        building, floor     capacity: up to
                  19     350      6      tool shop                                                   ground
                                                          covering –       3 tones, electric      pipelines on
                                                          reinforced        motors: small,
                                                        concrete slabs      electric trolley       overpasses