Page 72 - 6880
P. 72
L, m Q, t The object Elements of object:
Variant economic Building Equipment networks
of
Energy
activity
plastered wood small and water supply
medium and gas
pipelines
Metal working
Three-storey machines: small, Underground
masonry
foundry building, floor electric motors: cable lines,
11 200 1 medium, underground
shop covering –
reinforced wooden lines of the
concrete slabs cabinets, water supply
shelves, boxes
One-storey
reinforced
concrete Forging
building with hammers: Underground
mechanical crane heavy and cable lines,
12 230 5 underground
shop equipment medium, lines of the
capacity up to electric motors: water supply
10 tons, floor medium
covering –
concrete slabs
Two-storey Compressors: Underground
masonry medium,
building, floor electric motors: cable lines,
13 100 0.2 tool shop underground
covering – medium, lines of the
reinforced instrumentation
concrete slabs , water supply
Steam boilers,
One-storey pumps, Underground
masonry
blacksmith building, floor instrumentation cable lines,
14 120 0.3 , electric underground
shop covering – motors: lines of the
reinforced
concrete slabs medium and water supply
small
compressor One-storey Lifting cranes Underground
15 150 2
station masonry with a carrying cable lines,
building, floor capacity: up to underground
72