Page 75 - 6880
P. 75
L, m Q, t The object Elements of object:
Variant economic Building Equipment networks
of
Energy
activity
concrete slabs instrumentation pipelines
One-storey Lifting cranes Underground
masonry
building, floor with a carrying cable lines,
25 380 20 tool shop capacity: up to underground
covering – 10 tones, lines of the
reinforced
concrete slabs pneumatic tool water supply
One-storey Underground
masonry Thermal
blacksmith building, floor furnaces, gas cable lines,
26 400 25 ground
shop covering – ovens, pipelines on
reinforced instrumentation
concrete slabs overpasses
Lifting cranes
One-storey with a carrying
building with capacity: up to Underground
armored 5 tones, electric
compressor concrete frame motors: cable lines,
27 175 17.5 underground
station and masonry. medium and lines of the
50 % of walls small, metal water supply
area are working
windows machines:
heavy
Lifting cranes
One-storey with a carrying Underground
masonry capacity: up to
boiler building, floor 10 tones, cable lines,
28 300 7 ground
house covering – electric motors: pipelines on
reinforced small,
concrete slabs conveyor- overpasses
current line
Lifting cranes
One-storey Underground
foundry with a carrying
29 250 4.5 masonry cable lines,
shop building, floor capacity: up to ground
covering – 3 tones, electric pipelines on
motors:
75