Page 83 - 6748
P. 83

Beatrice:  At  this  stage,  I'm  not  asking  you  to  give  me  a  detailed  breakdown  of  all  the  IT
                  equipment  we’re  going  to  need.  It  would  just  be  useful  to  have  a  rough  idea  of  what's  most
                  urgent.
                  Dan: Sure. Well, one of the biggest problems is the screens at the CAD stations. A lot of those
                  need replacing with bigger ones. Roughly speaking, I'd say well over half of them are too small.
                  A good two thirds of them, actually. So, we're talking about 15 to 18 screens, something like that.
                  Beatrice: OK. How urgent is that?
                  Dan: Well, I mean they all work, they all function properly. The trouble is, the engineers spend
                  the vast majority of their time working with these screens. And because the detail on them is so
                  small, it's pretty hard work on the eyes, to the point that it affects productivity so ...
                  Beatrice: OK. And what about the big printer in here? I’ve heard it’s a bit of a dinosaur.
                  Dan: Well, it is, but it works perfectly well, and we print next to nothing with it, anyway. Most of
                  the drawings are printed at the factory.
                  Beatrice: Oh.

                  b Find words and phrases in audioscript 8.9 on page 93 to match the following definitions
                  (1-5).
                  1      approximately/
                  2      much more than /
                  3      at least /                    (two thirds)
                  4      most /
                  5      almost zero /

                  c  Complete  the  following  replies  to  express  the  figures  in  approximate  terms  using  the
                  words in Exercises 11 d and 12b. Sometimes more than one answer is possible.
                  1      How old is this equipment?   A good       five years old. (at least 5 years)
                  2      What percentage of the PCs need changing?                         all of them. (95%)
                  3      How many of the computers are up to spec?                         all of them.  (70%)
                  4      How many of the staff use the CAD system?                         half of them. (55%)
                  5      How much would the new printers cost?                      $2,000.     ($3,120)
                  6      How much does an adapter like this cost?                   . ($2)
                  7      How long would a full system take to install?                     5 days. (4-6 days)
                  8      Can most of our clients read these files? Yes,                    of them.    (95%)

                  13   You are setting up a small company of consulting engineers employing seven members
                  of  staff  -  five  engineers  and  two  assistants.  You  need  to  rent  an  office,  equip  it  with  a
                  computer  network  with  CAD  system  and  admin  software,  and  buy  other  basic  office
                  equipment. In pairs, discuss some ballpark figures relating to the following questions.
                  •      What computer equipment will be required and how much will it cost to buy?
                  •      What other items of furniture/equipment will be needed, and how much will this cost?
                  •      How much floor space will be required in the open-plan office?
                  •      How long will it take to set up the office - install the furniture and equipment?














                                                                                                             81
   78   79   80   81   82   83   84   85   86   87   88