1      Issuing the first draft of a specialised hydraulic hose drawing for the ski lift
                  2      Designing an electrical supply system for some water-cooling equipment
                  3      Revising  the  connection  details  between  some  ski-lift  machinery  and  its  concrete
                  foundation
                                                IV Resolving design problems

                  12 In pairs, discuss problems that can arise when different drawings that make up a design
                  are not properly coordinated.
                  13a    The  following  records  are  from  the  indoor  ski  complex  project.  They  show
                  correspondence between the design team and construction team. Read through the texts
                  quickly and answer the following questions.
                  1      What is the general subject of the correspondence?
                  2      What is meant by query and instruction?
                  3      Some queries refer to earlier conversations. Suggest why these have been followed up in
                  writing.
                  4      What is meant by dwg and dims?


                  CONTRACTOR'S QUERY No. 867                      ENGINEER'S INSTRUCTION
                  Following  our  telephone  conversation  today,  We  confirm  the  correct  dimension  is  on  dwg
                  we  note  that  there  is  a  discrepancy  between  76E. Please disregard the dims on dwg 78E.
                  dwgs 76E and 78E, which indicate conflicting
                  dimensions for the width of the roof opening.
                  Please clarify which dimension is correct.
                  CONTRACTOR'S QUERY No. 868                      ENGINEER'S INSTRUCTION
                  As discussed this morning on site, we confirm  Please work to attached sketch S33. Revision
                  there  is  a  clash  between  the  proposed  cable  of dwg E56 to follow.
                  tray (dwg E56) and air-conditioning ductwork
                  (now installed as per dwg Ml 1 8) in the ceiling
                  void  at  Grid  D14.  Please  advise  on  an
                  alternative cable route.
                  CONTRACTOR'S QUERY No. 869                      ENGINEER'S INSTRUCTION
                  A note on dwg 11A specifies black bolts at the  Please  provide  further  details  of  the  HSFG
                  base  of  the  ski  lift  cable  support.  This  bolts you are proposing.
                  contradicts the specification, which states that
                  all  joints  to  comprise  High  Strength  Friction
                  Grip bolts. We propose using HSFG fixings at
                  this location.
                  CONTRACTOR'S QUERY No. 870                      ENGINEER'S INSTRUCTION
                  Further  to  Query  869,  the  proposed  HSFG  Approved.
                  bolts  are  as  per  those  specified  for  all  other
                  bolted  joints  on  the  ski  lift  supports.  Our
                  intention is to use a single bolt spec to facilitate
                  assembly.

                  b      Read the correspondence in detail. Write the query numbers in Exercise 13a next to
                  the descriptions (1 -5). You will need to refer to some queries more than once.
                  1      An installation that won’t fit. as components are in each other’s way     868
                  2      A response from the engineer asking for more information
                  3      Queries that suggest a solution, which will require the engineer’s approval
                                               .