Page 132 - 6634
P. 132

inspection and maintenance.
































                                Figure 6.37 - TLP production system. (Courtesy

                                                         Vetco)









                TEMPLATE


                      The  21-well  unitized  template  design  shown  in  fig.  6.38  was  based  on

               strength requirements and use of an easily procurable material. Possible installation

               and leveling techniques are discussed fully in "Floating Drilling."

                      This template contains 17 standard wellhead receptacles in addition to four

               leveling pile inserts that may become well slots upon completion of the leveling

               operations.  The  21  wells  share  guideposts,  as  they  are  spaced  8  Vz  ft  between

               centers.  Also  included  at  one  end  of  the  template  structure  is  a  sales  riser


               base/receptacle. The sales line receptacle will receive the 123/4-in. OD pipeline.














                                                            133
   127   128   129   130   131   132   133   134   135   136   137