connected  with  cylinder  (or  hydraulic  press)  and  manometer.  Water
                  for the experiment is filtrated and vacuumized beforehand in capacity
                  4 (in order to remove the air dissolved in it). Before the experiment
                  the installation is vacuumized through valve 13 and manifold 5. Under

                  the pressure which is transmitted by gas (air) or oil the water comes
                  from the discharge capacity to the core  holder 6 with the rock sample
                  and  then  to  measuring  capacity  9.  The  pressure  behind  the  core  is

                  measured by means  of  manometer (indicating pressure gage) 8 and
                  the pressure in front of the core is measured by means of  manometer
                  (indicating  pressure  gage)  7.  For  the  experiment  carrying  out
                  stopwatch is also needed.

                        Besides  installation  WCPE-1  (ВКТВ-1)  the  rock  permeability
                  coefficient  for   water  can  be  determined  also  using  the  installation

                  IIPC-1M  (УДПК-1М).  It  is  possible  to  model  formation  conditions

                  (pressure  and  temperature)  by  means  of  this  installation.  The
                  installation  IIPC-1M  (УДПК-1М)  is  also  used  for  determining  the
                  effective permeability coefficient. The installation IIPC-1M (УДПК-

                  1М) (figure 4.2) consists of 2 measuring presses; hand-power press;
                  tanks;  core  holder;  manometers;  filters;  differential  manometer;
                  cylinder  with  pressed  gas;  capacity  with  a  dryer;  piston  container;

                  electric  motor;  worm  reduction  gear;  friction  variable-speed  drive;
                  reduction  gear  of  planet  type and gears.



                                          4.4 Procedure and calculations


                        4.4.1 Measure the length and the diameter of  the core and insert it

                  into core holder 6.

                        4.4.2  Fill capacity 4 with some filtered water and conduct water
                  vacuumizing till the air removes completely. Simultaneously by means

                  of valve 12 vacuumize the installation in condition that valves 11, 15,
                  18 are  closed.

                        4.4.3 Close valve 12 and stop vacuumizing. By means of valve 13

                  fill the system with some water and fill capacity 2 with oil.
                        4.4.4 Open the cylinder with gas and by means of microreducer

                  (reduction gear) 10 regulate the pressure in front of the rock sample

                  (additional  regulation  of  the pressure  in  front  of  the  core  and  water