Page 108 - 6685
P. 108

§7 FORECASTING DEVELOPMENT INDICATORS

                  Technological  indicators  of  development  at  the  stage  of
          design  determine  the  results  of  hydrodynamic  calculations.  To
          obtain these results need to have a large number of factors (the oil
          drives,  parameters  of  the  reservoir,  parameters  of  the  fluids,
          operating conditions of wells, etc.). Accurate knowledge of these
          data, especially in the early development unlikely. Therefore, to do
          the forecasting.
                  Forecasting  –  it  is  a  prediction  installation  of  further
          development, i.e. the course of the process of development in the
          future. There are forecasting oil production worked well-day and
          forecasting  oil  production  under  characteristics  water-oil
          displacement.


                  7.1 Forecasting oil production worked well-day

                    Forecasting  oil  production  worked  well-day  –  it  is
          forecasting  oil  production  using  the  results  of  previous
          development. It is performed in the following order.
                    The study evidence of oil set basic patterns in the changes
          of oil in recent years. The dynamics of oil production in time trace
          using  charting.  In  constructing  graphs  on  the  vertical  axis  –  oil
          production, and the horizontal axis - time. Since the operation field
          is  constantly  changing  a  number  of  wells,  the  construction
          schedules  when  oil  production  is  set  to  worked  well-day.  After
          plotting  selected  analytical  expression  curve  of  production  over
          time. With regard to the prediction of oil wells worked on a day
          widely used in oilfield practice was the formula:
                q ( t )  a  t    b ,                                                              (7.1)
                 oil
          where  a,  b  -  coefficients  are  determined  using  actual  processing
          results.







                                        108
   103   104   105   106   107   108   109   110   111   112   113