Page 76 - 4822
P. 76

Figure 5.9 –Plunger Lift

                  When the plunger reaches the wellhead plunger catcher, the
           valve opens and allows gas to flow freely for some time while new
           liquid collects at the bottom. After some preset time the catcher
           will release the plunger, and the cycle repeats.

                  Well workover, intervention and stimulation
                  After  some  time  in  operation,  the  well  may  become  less
           productive  or  faulty  due  to  residue  build  up,  sand  erosion,
           corrosion or reservoir clogging.
                  Well  workover  is  the  process  of  performing  major
           maintenance on an oil or gas well. This might include replacement
           of  the  tubing,  cleanup  or  new  completions,  new  perforation  and


                                          76
   71   72   73   74   75   76   77   78   79   80   81