Page 68 - 4670
P. 68

location  to  determine  the  elevation  at  another  location.  As  with
                  horizontal  datums,  the  advanced  technology  of  GPS  has  almost
                  completely replaced this classical technique of vertical measurement.
                  One  of  the  main  uses  of  the  vertical  datum  is  to  measure  rates  of

                  subsidence, or land sinking.
                        By referencing the vertical datum, officials can determine the true
                  elevation and position of the hurricane evacuation routes, as well as

                  how much they have sunk over past decades.


                        Task 3. Answer the questions to the text.
                        1. What do geodesists and surveyors use datums for?

                        2. What is “datums”?
                        3. What is a local geodetic datum defined by?
                        4. What constants is the global geodetic datum defined by?

                        5. How do we define the horizontal datum?
                        6. How does the surveyor create a horizontal datum?
                        7. What is a vertical datum?
                        8. What do surveyors use to mark positions in the vertical datum?

                        9. What is the vertical datum used for?


                        Task 4. Define whether the following statements are true or
                        false and translate them. Correct the false ones according to
                        the text.

                        1. Datums are the basis for all geodetic survey work.

                        2. A local geodetic datum is used in satellite geodesy?
                        3. A  global  geodetic  datum  is  defined  by  three  constants  to
                  specify the origin of the coordinate system (x, y, z).

                        4. To “connect” the horizontal monument into a unified network,
                  surveyors have used differential leveling.
                        5. Horizontal datum is used in monitoring the movement of the
                  Earth’s crust.

                        6. Triangulation  uses  a  known  elevation  at  one  location  to
                  determine the elevation at another location.
                        7. The vertical datum is used to measure rates of subsidence or

                  land sinking.







                                                              68
   63   64   65   66   67   68   69   70   71   72   73