Page 94 - 6634
P. 94

support on which the BOP stack (and, subsequently, the completion tree) will be

               landed, connected, and sealed. The function of the casing hangers is to hang off

               and support the load of the casing strings within the subsea wellhead housing.

                      With this housing, a guide base system, consisting of a temporary guide base

               (TGB)  and  a  permanent  guide  structure  (PGS),  will  provide  an  anchor  for  the

               guidelines  and  serve  as  the  initial  support  structure  for  installing  the  wellhead

               system.

                      The  first  piece  of  subsea  equipment  used  in  a  typical  floating  drilling

               operation is the TGB, through which the drilling assembly will be guided to drill

               the 36-in. diameter conductor hole.



































                                  Figure 6.15 - Temporary guide base. (Courtesy Vetco)

                      The temporary  guide base has  four  guideline attachments on a 6-ft radius

                (fig. 6.16). Its four anchor spikes will penetrate 18 in. of the sea floor. The center

                of this TGB is a funnel-shaped landing ring that accepts the gimballed base of the

                permanent guide structure, even in soft-bottom conditions. The permanent guide

                structure, adaptable for drilling or jetting, supplies the landing seat for the 30-in.



                                                             94
   89   90   91   92   93   94   95   96   97   98   99