c) sand;
d) no correct answer.
13. Special high-pressure pumps move the slurry through very strong … , or lines,
to a cementing head, or plug container.
a) pipes;
b) casing;
c) cementing tube;
d) no correct answer.
14. As the last of the cement … enters the casing, a crew member releases a
topping from the cementing head.
a) slurry;
b) solution;
c) fluid;
d) no correct answer.
15. Displacement fluid, which is usually … water or a specially formulated drilling
mud, moves, or displaces, the cement from the casing as the cement pump
applies pressure to move the cement and fluid down the casing.
a) mineral;
b) salt;
c) organic;
d) low-carbonated.
16. Continued pumping moves the cement, the top plug, and the displacement fluid
… the casing.
a) down;
b) up;
c) up and down;
d) no correct answer.
17. With the kelly made up, the driller starts the mud pump, … the kelly drive
bushing to engage the master bushing.
a) raises;
b) lowers;
c) inserts;
d) no correct answer.
45