Page 35 - 4924
P. 35

a) pinch out
                  b) piercement dome
                  c) pinch out
                  d) no correct variant

                                                             Unit 7

                                                         The drill site
                   Answer the following questions.

                   1.  What is drilling mud used for?
                   2.  Is it possible for companies to drill in frozen wildernesses and humid jungles?
                   3.  Is it difficult to choose an appropriate site for drilling? Explain your answer.
                   4.  Enumerate the factors, paid attention to, in the process of choosing the site.
                   5.  Why are the geologists hired by major drilling companies?
                   6.  What does the phrase “to spud the hole” mean?
                   7.  What  materials  are  used  for  preparing  the  surface  and  roads  around  a  land
                      location?
                   8.  Why is it important to remove harmful material from the pit?
                   9.  What is the purpose of a “cellar”?
                   10.  What is the difference between a mousehole and a rathole?


                   Choose the correct answer.


                  1. What is the location of the well called?
                  a) the drill rig
                  b) the drill flour
                  c) t  he drill site
                  d) no correct variant

                  2. Costs depend on such factors as the size of the reservoir, its depth, and its …
                  a) location
                  b) height
                  c) smell
                  d) no correct variant

                  3. The most important is that the company knows or believes that hydrocarbons
               exist in …beneath the site
                  a) the sea
                  b) the rocks
                  c) the ocean
                  d) no correct variant

                  4. On land sites, the operator hires … to prepare the location to accommodate the
               rig


                                                                                                              33
   30   31   32   33   34   35   36   37   38   39   40